Dykstra Levee
Auburn, WA
Repaired Green River levee in three locations and within existing neighborhood. Project entailed removal of saturated bank materials, re-armoring levee banks with rock, import, export and extensive erosion control for river protection. Project received top rating by Army Corps of Engineers and completed one month ahead of schedule.
GENERAL CONTRACTOR:
Cherokee General Contractors & US Army Corps of Engineers
© 2018 All Rights Reserved.